Project 1: Emergency Sewer Line Collapse Repair — Augusta Plant
MPD was called in to respond to a major sewer line collapse approximately 10 feet underground at a local plant in Augusta. Working alongside AIS, our team coordinated and executed the entire repair process—from demolition and excavation to sewer line repairs, site cleanup, and concrete restoration.
Thanks to the combined efforts of both teams, the project was completed in less than a day, allowing the plant to resume full operations within 48 hours of the initial call.
A great example of rapid response, teamwork, and efficient execution when critical infrastructure is on the line.
Project 2: Water Leak Repair, Bobby Jones Expressway
MPD performed a water leak repair on piping located along the Bobby Jones Expressway. The team assessed the affected section of pipe, addressed the source of the leak, and completed the necessary repairs to restore the line to proper working condition.